Welcome, Guest | Sign In
Home page
Showing 1 - 10 of 36 Results
 
Page: 1 2 3 4 
Results Per Page: 10 | 25 | 50
Hide Thumbnail
Item Number
Description
1/4 PINT P-70 PURPLE PRIMER	Premium<br />
	Industrial strength<br />
	For use on Schedule 80 (PN 10 and higher) and large size pipe<br />
	Excellent for cold weather applications.<br />
<br />
CE-P701/4PT
1/4 PINT P-70 PURPLE PRIMER
  • Premium
  • Industrial strength
  • For use on Schedule 80 (PN 10 and higher) and large size pipe
  • Excellent for cold weather applications.
1/2 PINT P-70 PURPLE PRIMER	Premium<br />
	Industrial strength<br />
	For use on Schedule 80 (PN 10 and higher) and large size pipe<br />
	Excellent for cold weather applications.<br />
<br />
CE-P701/2PT
1/2 PINT P-70 PURPLE PRIMER
  • Premium
  • Industrial strength
  • For use on Schedule 80 (PN 10 and higher) and large size pipe
  • Excellent for cold weather applications.
PINT P-70 PURPLE PRIMER	Premium<br />
	Industrial strength<br />
	For use on Schedule 80 (PN 10 and higher) and large size pipe<br />
	Excellent for cold weather applications.<br />
<br />
CE-P70PT
PINT P-70 PURPLE PRIMER
  • Premium
  • Industrial strength
  • For use on Schedule 80 (PN 10 and higher) and large size pipe
  • Excellent for cold weather applications.
QUART P-70 PURPLE PRIMER	Premium<br />
	Industrial strength<br />
	For use on Schedule 80 (PN 10 and higher) and large size pipe<br />
	Excellent for cold weather applications.<br />
<br />
CE-P70QT
QUART P-70 PURPLE PRIMER
  • Premium
  • Industrial strength
  • For use on Schedule 80 (PN 10 and higher) and large size pipe
  • Excellent for cold weather applications.
GALLON P-70 PURPLE PRIMER	Premium<br />
	Industrial strength<br />
	For use on Schedule 80 (PN 10 and higher) and large size pipe<br />
	Excellent for cold weather applications.<br />
<br />
CE-P70G
GALLON P-70 PURPLE PRIMER
  • Premium
  • Industrial strength
  • For use on Schedule 80 (PN 10 and higher) and large size pipe
  • Excellent for cold weather applications.
CLEAR PRIMER QUART	Premium<br />
	Industrial strength<br />
	For use on Schedule 80 (PN 10 and higher) and large size pipe<br />
	Excellent for cold weather applications.<br />
<br />
CE-P70CQT
CLEAR PRIMER QUART
  • Premium
  • Industrial strength
  • For use on Schedule 80 (PN 10 and higher) and large size pipe
  • Excellent for cold weather applications.
1/2 PINT 705 CEMENT FAST	Medium Bodied<br />
	Fast Setting<br />
	For use on all classes and schedules with interference fit through 6? diameter, Schedule 80 through 4? diameter<br />
	Can be used without primer on non-pressure systems if local codes permit.<br />
<br />
CE-7051/2PT
1/2 PINT 705 CEMENT FAST
  • Medium Bodied
  • Fast Setting
  • For use on all classes and schedules with interference fit through 6″ diameter, Schedule 80 through 4″ diameter
  • Can be used without primer on non-pressure systems if local codes permit.
PINT 705 CEMENT FAST SETTING	Medium Bodied<br />
	Fast Setting<br />
	For use on all classes and schedules with interference fit through 6? diameter, Schedule 80 through 4? diameter<br />
	Can be used without primer on non-pressure systems if local codes permit.<br />
<br />
CE-705PT
PINT 705 CEMENT FAST SETTING
  • Medium Bodied
  • Fast Setting
  • For use on all classes and schedules with interference fit through 6″ diameter, Schedule 80 through 4″ diameter
  • Can be used without primer on non-pressure systems if local codes permit.
QUART 705 CEMENT FAST SETTING	Medium Bodied<br />
	Fast Setting<br />
	For use on all classes and schedules with interference fit through 6? diameter, Schedule 80 through 4? diameter<br />
	Can be used without primer on non-pressure systems if local codes permit.<br />
<br />
CE-705QT
QUART 705 CEMENT FAST SETTING
  • Medium Bodied
  • Fast Setting
  • For use on all classes and schedules with interference fit through 6″ diameter, Schedule 80 through 4″ diameter
  • Can be used without primer on non-pressure systems if local codes permit.
CLEAR GALLON 705 CEMENT	Medium Bodied<br />
	Fast Setting<br />
	For use on all classes and schedules with interference fit through 6? diameter, Schedule 80 through 4? diameter<br />
	Can be used without primer on non-pressure systems if local codes permit.<br />
<br />
CE-705G
CLEAR GALLON 705 CEMENT
  • Medium Bodied
  • Fast Setting
  • For use on all classes and schedules with interference fit through 6″ diameter, Schedule 80 through 4″ diameter
  • Can be used without primer on non-pressure systems if local codes permit.
Showing 1 - 10 of 36 Results
 
Page: 1 2 3 4